Monday 17 October 2016

Monday 17th October 2016

A very warm and sunny day, rain late this afternoon with a double rainbow.
What a Monday, car in for MOT by 8am, workmen started work on the drive and I demolished the fruit cage.
Workmen made a good start on the drive, 95% of the old concrete now broken up awaiting a grab lorry tomorrow to remove. I made a start on taking down the fruit cage ready for the second part of the meadow project. This area will be a standard lawn with a border of wildflower plants. The wire initially will be used to cover the newly sown seed as a protection against foxes, cats and deer.
Not sure what has happened to the layout tonight, all over the place.
Picture 1 - Foxy under the bird feeder at lunchtime.
Picture 2 - First go at the concrete drive with the compressor.
Picture 3 - A start on breaking up the concrete.
Picture 4 - 95% broken up.
Picture 5 - Taking down the fruit cage.
Picture 6 - Fruit cage down.
Picture 7 - Rainbow late this afternoon.
















No comments:

Post a Comment