Friday 9 March 2012

Friday 9th March 2012.



Very mild day but a lack of Sunshine!
Spent day working on the Alpine Bed. Gravel that was the base for the Bonsai Trees was shovelled out and used to create a path at the side of the Useful Room.
225 x 75mm Treated Timber with 75 x 75mm Posts has been used to produce the structure for the raised bed. Once fixed in place this will be then filled with 50% Compost Base and 50% Gravel Top Layer. The Alpine Plants will be planted in 225mm Clay Pots which in turn will be buried in the Gravel so the Rim is just showing.
Most noticable Bird activity today was Woody spending a large part of the day in the Silver Birch Tree. Still hoping they will use the Nesting Box.
Picture 1 - Woody in Silver Birch Tree.
     "     2 - Alpine project - base cleared for Timber Frame.
     "     3 -     "          "     - base taking shape, all level and ship shape!